Shared Power Switch Assembly #590

Merged
muellerr merged 2 commits from assy_proper_recovery_handling into develop 2023-04-12 12:58:50 +02:00
Owner
No description provided.
muellerr added 1 commit 2023-04-11 22:58:57 +02:00
done
Some checks failed
EIVE/eive-obsw/pipeline/head Build started...
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit
c9cc1d4cfe
muellerr requested review from meggert 2023-04-11 22:59:00 +02:00
muellerr added this to the v1.45.0 milestone 2023-04-11 22:59:03 +02:00
meggert requested changes 2023-04-12 09:28:34 +02:00
meggert left a comment
Owner

fix unittest, otherwise lgtm

fix unittest, otherwise lgtm
muellerr added 1 commit 2023-04-12 10:52:41 +02:00
fix untitest
All checks were successful
EIVE/eive-obsw/pipeline/pr-develop This commit looks good
df7236cfee
muellerr merged commit d71031f2e4 into develop 2023-04-12 12:58:50 +02:00
muellerr deleted branch assy_proper_recovery_handling 2023-04-12 12:58:50 +02:00
Sign in to join this conversation.
No description provided.