changelog typo
Some checks failed
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit

This commit is contained in:
2023-03-09 19:43:38 +01:00
parent 9d5f846658
commit 1dee29aabd

View File

@ -22,7 +22,7 @@ will consitute of a breaking change warranting a new major release:
This was done by moving the dumping of TMs to the VCs into separate threads with permanent loops.
These threads are then able to process high TM loads on demand. The PUS TM funnel will route
PUS packets to the approrpiate persisten TM stores and then demultiplex the TM to all registered
TM destinations are before.
TM destinations as before.
## Fixed