Commit Graph

12 Commits

Author SHA1 Message Date
b5660d582e
update switch initializer
Some checks failed
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit
2022-03-07 14:56:21 +01:00
f83153934c
command init switch state
Some checks failed
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit
2022-03-07 14:46:46 +01:00
32def71502
first version of ACS board ASS working
Some checks failed
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit
- Testes transition OFF to NORMAL for A side
- Refactored power switching so it can be used by SUS ass as well
- Generate events for sending switch command
- Generate event if switch state changes
- Deny Q7S switch commanding
2022-03-05 03:02:09 +01:00
0904cadde5
continued ACS board assembly 2022-03-04 18:12:16 +01:00
a7c1dafce5
added mutex protection for power switches
All checks were successful
EIVE/eive-obsw/pipeline/pr-develop This commit looks good
2022-03-03 19:39:36 +01:00
77c45c0de9
applied formatting
Some checks failed
EIVE/eive-obsw/pipeline/head Build queued...
EIVE/eive-obsw/pipeline/pr-develop There was a failure building this commit
2022-01-17 15:58:27 +01:00
b05a23dc86 solar array depl moved to bsp folder
hosted build working again
2021-02-27 19:46:13 +01:00
181da3594d pdu2 hk table periodic request 2021-02-06 16:13:31 +01:00
e25ffa1054 pdu2 dataset update snapshot 2021-02-06 11:57:45 +01:00
fd1e4f3473 commanding of HeaterHandler and GpioIF working 2021-02-01 11:17:20 +01:00
560e538f62 heater handler wip 2021-01-28 14:55:21 +01:00
61ed56ace9 heater wip 2021-01-23 17:22:40 +01:00